Płock · since 1992

We build infrastructurethat drives progress.

From design to delivery – without compromise.

We specialise in the repair and construction of process and transmission pipelines and in the repair and modernisation of storage tanks for the petrochemical and refining industry.

01 — The company

A family company. Industrial scale.

The renovation and construction company PROGRESS-⁠BUD B. Pliszka Sp.J. was established in 1992 and, having undergone various transformations, has been a family general partnership in its current form since 1996.

The company
years in business
34
tasks in our project list
241
capacity of tanks we modernise
100,000 m³
pipeline diameters we work on
DN1,200

02 — Offer

Three specialisations. One responsibility.

  1. Welder at work wearing a welding mask

    01/03

    Mechanical and installation works

    We specialise in the repair and construction of process and transmission pipelines, the repair and modernisation of storage tanks, and the assembly and disassembly of pipelines and industrial fittings, ensuring the highest precision and safety.

    • repair and modernisation of storage tanks
    • construction and repair of transmission pipelines for liquid fuels
    • assembly and disassembly of pipelines and industrial fittings
    • fabrication of steel structures up to execution class EXC3
    See more
  2. Worker in protective clothing next to pipelines at an industrial plant

    02/03

    Anti-corrosion and construction works

    We provide comprehensive anti-corrosion protection for concrete and steel, extending the durability of structures.

    • installation of reinforced-concrete bunds and chambers
    • foundation works
    • comprehensive anti-corrosion protection of concrete and steel
    See more
  3. Worker inspecting valves and fittings at an industrial plant

    03/03

    Insulation works

    We provide anti-corrosion protection of underground pipelines using insulating tapes.

    • thermal insulation of industrial equipment piping
    • moisture and current-resistant insulation of industrial and process pipelines
    • installation of ventilation ducts and equipment
    See more

03 — Projects

2025–2003

  1. 2025

    10 tasks

    Installation of a line gate valve on the Ø500 outlet pipeline with replacement of a tee at SZ-1 Kleczew

    PERN · AGAT · CKTiS · POLIMEX

  2. 2024

    10 tasks

    Replacement of two oil pumps in the central lubrication system of the line I and II pump stations at SC-1 Góry

    PERN · AGAT · MICRONET · CKTiS

  3. 2023

    8 tasks

    Installation of a leak tank for the line I pump station at SZ-1 Kleczew

    PERN · MICRONET

  4. 2022

    11 tasks

    Repair of the rolling ladder track on tank No. 31 at the Miszewko Strzałkowskie Base

    PERN · ORLEN · MICRONET

  5. 2021

    8 tasks

    Overhaul of 765 m of DN800 pipeline in Subkowy (Pomeranian Section, Gdańsk Base – Pelplin)

    PERN · ORLEN · AGAT · MICRONET

  6. 2020

    15 tasks

    Modernisation of the oil system and pump station at SC-1 Góry

    PERN · AGAT · MICRONET · STRABAG

  7. 2019

    12 tasks

    Detailed design documentation and overhaul of 5 rolling ladders on 30,000 and 32,000 m³ tanks at the Miszewko Strzałkowskie and Adamowo Bases

    PERN · CLIMBEX

  8. 2018

    9 tasks

    Overhaul of the pipeline under the Lesiska – Sompolno marsh

    AGAT · PERN

  9. 2017

    14 tasks

    Overhaul of the DN600 pipeline under a road and car park in Miszewko Strzałkowskie

    PERN · OLPP · CLIMBEX · AGAT

  10. 2016

    13 tasks

    Overhaul of a road crossing in Łęg

    PERN · OLPP · CLIMBEX · CKTiS

  11. 2015

    12 tasks

    Piping and foam system, as well as loading lines and arms, at Fuel Terminal No. 74 in Ostrów Wlkp.

    AGAT · PERN · CLIMBEX · MOTA-ENGIL

  12. 2014

    13 tasks

    Repair of the rolling ladder on tank No. 9 at the Miszewko Strzałkowskie Base

    PERN · OLPP · AGAT · CLIMBEX

  13. 2013

    9 tasks

    Construction of the MPS-1 and MPS-2 airfield fuel depots with a transmission pipeline at the Poznań-Krzesiny military airfield

    AGAT · PERN · CKTiS

  14. 2012

    16 tasks

    Modernisation of JET-A1 fuel loading and receipt at Fuel Terminal No. 81 in Kraków Olszanica

    AGAT · PERN · OLPP · ORLEN

  15. 2011

    21 tasks

    Lowering of a pipeline at BM 111 in Wrocław

    AGAT · PERN · OLPP · ORLEN

  16. 2010

    11 tasks

    Modernisation of the fire protection system at OLPP Fuel Base No. 9 in Wola Rzędzińska

    AGAT · PERN · MICRONET

  17. 2009

    8 tasks

    Furfural unit at Orlen Oil in Płock

    AGAT · PERN

  18. 2008

    9 tasks

    Replacement of DN 600 gate valves at the Bug–Narew river crossing

    PERN · AGAT

  19. 2007

    12 tasks

    Installation of a new rail loading system for standard and broad gauge track

    ORLEN · PERN

  20. 2006

    6 tasks

    Inspection of pipeline road crossings in Podolin, Karpin, Majków and Twardosławice

    PERN · NAFTOREMONT

  21. 2005

    6 tasks

    Inspection of pipeline road crossings in Koluszki

    PERN · NAFTOREMONT

  22. 2004

    4 tasks

    Inspection of pipeline road crossings in Łąck, Lubień Kujawski and Chotel

    PERN · NAFTOREMONT

  23. 2003

    4 tasks

    Inspection of pipeline road crossings in Sokołów Podlaski and Siemiatycze

    PERN

  24. Full project list

04 — Certificates

Authorisations that open refinery gates.

  • UDT
  • ISO 9001
  • ISO 45001
  • ISO 3834-2
  • EN 1090 · EXC3
Certificates