03 — Projects

List of projects

More than two decades of work for pipeline operators, refineries and fuel depots across Poland.

241tasks · 2003–2025

Year 2025

PERNFor PERN S.A., the following works were completed:

  • Installation of a line gate valve on the Ø500 outlet pipeline with replacement of a tee at SZ-1 Kleczew
  • Reconstruction of a 320 m section of the DN800 pipeline in Subkowy
  • Protection of a shallow-cover section of the R1 DN1200 crude oil transmission pipeline in Gdańsk
  • Modernisation of the KC1 pig trap chamber at SP2 Łasin
  • Installation of DN700 gate valves on the R34 DN700 section in Tank Farm No. 5 at the Miszewko Strzałkowskie Base
  • Installation of a DN800 gate valve on the R31 pipeline at the Miszewko Strzałkowskie Base

AGATFor AGAT S.A., the following works were completed:

  • Modernisation of fuel pipelines and fuel process works during the modernisation of the MPS Dębogórze depot

CKTiSFor CKTiS S.A., the following works were completed:

  • Modernisation of the COK heating unit at the ORLEN S.A. Production Plant in Płock

POLIMEXFor POLIMEX Infrastruktura Sp. z o.o., the following works were completed:

  • Comprehensive reconstruction of existing ORLEN DN500 – DN1200 crude oil pipelines in the road corridor during construction of the road system in the Northern Port area in Gdańsk

HYUNDAI / TRFor HYUNDAI Engineering Poland Sp. z o.o. TECNICAS REUNIDAS S.A. Sp. Jawna, the following works were completed:

  • Protection of DN200 fuel pipelines during construction of the OLEFINS III unit for PKN Orlen S.A.

Year 2024

PERNFor PERN S.A., the following works were completed:

  • Replacement of two oil pumps in the central lubrication system of the line I and II pump stations at SC-1 Góry
  • Removal of dents and shallow cover on the pipeline in Mirosław
  • Installation of a 1.25 m³ double-wall tank with associated infrastructure at the Miszewko Strzałkowskie Base

AGATFor AGAT S.A., the following works were completed:

  • Installation of PL1 and PL2a pump units during modernisation of the crude oil pump station at SC-1 Góry
  • Installation of a check valve on the PL3W pump unit and pipeline components, plus prefabrication and installation of supports at SF1 in Płock
  • Installation of a DN200 circulation pipeline connecting the Płock–Bydgoszcz line pump station with the Płock–Mościska long-distance pipeline

MICRONETFor MICRONET Sp z o.o Sp.K., the following works were completed:

  • Overhaul and modernisation of tank No. 18, V=50,000 m³, at the Miszewko Strzałkowskie Base

CKTiSFor CKTiS S.A., the following works were completed:

  • Pipeline tie-ins and valve replacement in the CHP hall during conversion of the COK heating unit to CHP at the ORLEN S.A. Production Plant in Płock
  • Replacement of COB district-heating water pumps at the ORLEN S.A. Production Plant in Płock

POLIMEXFor POLIMEX Infrastruktura Sp. z o.o., the following works were completed:

  • Comprehensive reconstruction of a PERN crude oil pipeline and installation of a casing pipe for the ORLEN R6 pipeline during construction of the road system in the Northern Port area in Gdańsk

Year 2023

PERNFor PERN S.A., the following works were completed:

  • Installation of a leak tank for the line I pump station at SZ-1 Kleczew
  • Overhaul of a section of the R28 pipeline at the Miszewko Strzałkowskie Base
  • Removal of the old line II leak tank and installation of a new one, including replacement of the drain lines and tank emptying system, at SW-2a Orzechowo
  • Removal of the old line II leak tank and installation of a new one, including replacement of the drain lines and tank emptying system, at SW-1 Zawady

MICRONETFor MICRONET Sp z o.o Sp.K., the following works were completed:

  • Overhaul and modernisation of tank No. 2A, V=100,000 m³, at the PERN Miszewko Strzałkowskie Base
  • Overhaul and modernisation of tank No. 10, V=32,000 m³, at the PERN Miszewko Strzałkowskie Base
  • Overhaul and modernisation of tank No. 11, V=32,000 m³, at the PERN Adamowo Base
  • Overhaul and modernisation of tank No. 15, V=32,000 m³, at the PERN Adamowo Base

Year 2022

PERNFor PERN S.A., the following works were completed:

  • Repair of the rolling ladder track on tank No. 31 at the Miszewko Strzałkowskie Base
  • Overhaul of the DN500 pipeline under a road in Łanięta (Góry – Kleczew)
  • Reconstruction of the line I pump station hydraulic system combined with modernisation of the suction system at the Miszewko Strzałkowskie Base
  • Overhaul and replacement of approx. 105 m of DN400 pipeline on the Płock – Koluszki section in Trzepowo
  • Modernisation of the overpressure protection system for the crude oil filters of the Tank Farm Pump Station at the Miszewko Strzałkowskie Base
  • Modernisation of the overpressure protection system of the line II inlet pipeline at the Miszewko Strzałkowskie Base
  • Construction of DN600 cross-connection pipelines between lines I and II at the SZ150 Węgrów and SZ151 Krypy valve stations

ORLENFor ORLEN Projekt S.A., the following works were completed:

  • Protection of PERN DN250, DN350 and DN400 pipelines at excavation No. 9 during the investment project “Intensification of Olefin Production at ZP Płock, Olefins III Complex”

MICRONETFor MICRONET Sp z o.o Sp.K., the following works were completed:

  • Overhaul and modernisation of tank No. 12, V=32,000 m³, at the PERN Miszewko Strzałkowskie Base
  • Overhaul and modernisation of tank No. 14, V=50,000 m³, at the PERN Gdańsk Base
  • Overhaul and modernisation of tank No. 23, V=100,000 m³, at the PERN Adamowo Base

Year 2021

PERNFor PERN S.A., the following works were completed:

  • Overhaul of 765 m of DN800 pipeline in Subkowy (Pomeranian Section, Gdańsk Base – Pelplin)
  • Installation of leak tanks for the line I and II pump stations at the Miszewko Strzałkowskie Base

ORLENFor ORLEN Projekt S.A., the following works were completed:

  • Protection of PERN DN250, DN350 and DN400 pipelines at excavation No. 8 during the investment project “Intensification of Olefin Production at ZP Płock, Olefins III Complex”

AGATFor AGAT S.A., the following works were completed:

  • Construction of final product pipelines for HDD crossings under the Vistula and decommissioning of the standby string of the fuel pipeline under the Vistula in Płock

MICRONETFor MICRONET Sp z o.o Sp.K., the following works were completed:

  • Overhaul and modernisation of tank No. 14, V=100,000 m³, at the PERN Miszewko Strzałkowskie Base
  • Overhaul and modernisation of tank No. 2, V=50,000 m³, at the PERN Gdańsk Base
  • Overhaul and modernisation of tank No. 4, V=50,000 m³, at the PERN Gdańsk Base
  • Overhaul and modernisation of tank No. 24, V=100,000 m³, at the PERN Adamowo Base

Year 2020

PERNFor PERN S.A., the following works were completed:

  • Modernisation of the oil system and pump station at SC-1 Góry
  • Overhaul of the line I pump station oil system at SZ-1 Kleczew
  • Overhaul of the line I pump station oil system at SZ-3 Łupowo
  • Modernisation of the draining and venting system of six pump casings in the Tank Farm pump station bund at the Miszewko Strzałkowskie Base
  • Overhaul of the reinforced-concrete roof slab of the line I pump station with its support structure at SZ-1 Kleczew
  • Overhaul of the process installation of the distribution well in the tank field at Fuel Base No. 15 in Narewka
  • Modernisation of line I main pump load relief at SC-1 Góry
  • Modernisation of line I main pump load relief at SZ-1 Kleczew
  • Adaptation of pipelines on the Eastern Section to allow pumping from Płock to Adamowo
  • Replacement of line I auxiliary system pipes at SZ-2 Tarnowo Podgórne

AGATFor AGAT S.A., the following works were completed:

  • Prefabrication and installation of pipelines plus supply and installation of supports during expansion of tank farms 22 and 23 at PERN Base No. 5 in Emilianów

MICRONETFor MICRONET Sp z o.o, the following works were completed:

  • Overhaul and modernisation of tank No. 5, V=30,000 m³, at the PERN Miszewko Strzałkowskie Base
  • Overhaul and modernisation of tank No. 27, V=50,000 m³, at the PERN Miszewko Strzałkowskie Base
  • Overhaul and modernisation of tank No. 32, V=50,000 m³, at the PERN Miszewko Strzałkowskie Base

STRABAGFor STRABAG Sp z o.o, the following works were completed:

  • Protection of pipelines during construction of Nowa Portowa Street and an internal road connecting the PCI road system with Nowa Portowa Street in Gdańsk

Year 2019

PERNFor PERN S.A., the following works were completed:

  • Detailed design documentation and overhaul of 5 rolling ladders on 30,000 and 32,000 m³ tanks at the Miszewko Strzałkowskie and Adamowo Bases
  • Overhaul of process bunds and repainting of process pipelines at SP-2 Łasin
  • Overhaul of the line I pump station oil system and anti-corrosion protection of pipelines and valves in the Z141, Z113 and Z111 valve bunds at SZ-3 Łupowo
  • Modernisation of the SZ-5K Retki valve station on the Płock – Koluszki pipeline
  • Overhaul of the bund under ball valves No. 501 and 502 at the outlet manifold of the Adamowo Base
  • Overhaul of the line II leak tank at the Adamowo Base
  • Modernisation of the Crude Oil Metering Station (WOR) at the PERN Adamowo Base
  • Replacement of wedge gate valves in the petrol and diesel pump stations at Fuel Base No. 2 in Nowa Wieś Wielka
  • Modernisation of the V=100 m³ leak tank at SZ-1 Kleczew

CLIMBEXFor CLIMBEX S.A., the following works were completed:

  • Overhaul and modernisation of tank No. 14, V=32,000 m³, at the PERN Adamowo Base
  • Overhaul and modernisation of tank No. 16, V=32,000 m³, at the PERN Adamowo Base
  • Overhaul and modernisation of tank No. 18, V=32,000 m³, at the PERN Adamowo Base

Year 2018

AGATFor AGAT S.A., the following works were completed:

  • Overhaul of the pipeline under the Lesiska – Sompolno marsh
  • Construction and installation works at MPS-1 in Powidz
  • Prefabrication and installation of pipelines during construction of tanks at the Fuel Base in Koluszki
  • Installation of a DN250 pipe and gate valve in Biała Dolna
  • Installation of a DN250 pipe and gate valve in Wierzchowiska

PERNFor PERN S.A., the following works were completed:

  • Overhaul of foam headers at the SR stations at the Fuel Base in Nowa Wieś Wielka
  • Repair of the embankment protecting the line I and II pipelines in Lubiechów Górny
  • Replacement of headers and gate valves at the distribution stations at the Fuel Base in Nowa Wieś Wielka
  • Replacement of the ladder on tank No. 11 at the Miszewko Strzałkowskie Base

Year 2017

PERNFor PERN S.A., the following works were completed:

  • Overhaul of the DN600 pipeline under a road and car park in Miszewko Strzałkowskie
  • Modernisation of pump load relief at SZ-3 Łupowo
  • Modernisation of the leak tank at SZ-1 Kleczew
  • Elimination of a shallow-cover section in Łęg
  • Modernisation of the oil system at ST-5 Tarnowo Podgórne

OLPPFor OLPP Sp. z o.o., the following works were completed:

  • Construction of a new diesel (ON) and light fuel oil (OOP) bund at the Fuel Base in Nowa Wieś Wielka
  • Dismantling of roofs on tanks 16 and 17 at the Fuel Base in Nowa Wieś Wielka
  • Overhaul of the water and foam systems in tank groups I and III at the Fuel Base in Nowa Wieś Wielka
  • Adaptation of the pipeline for increased flow rates at the Fuel Base in Nowa Wieś Wielka

CLIMBEXFor CLIMBEX S.A., the following works were completed:

  • Overhaul of a tank at the Wierzbno Fuel Terminal
  • Overhaul of tank No. 4 at the Miszewko Strzałkowskie Base
  • Overhaul of tanks No. 6 and 8 at the Gdańsk Base
  • Overhaul and certification of tank 22, V=100,000 m³, at the Adamowo Base

AGATFor AGAT S.A., the following works were completed:

  • Construction of an ON-LINE additive installation at Fuel Base No. 21 in Dębogórze

Year 2016

PERNFor PERN S.A., the following works were completed:

  • Overhaul of a road crossing in Łęg
  • Overhaul of the DN500 pipeline under a road in Witnica
  • Overhaul of the line I pipeline at the military training ground in Skwierzyna
  • Repair of the dyke separating the tanks at the Miszewko Strzałkowskie Base

OLPPFor OLPP Sp. z o.o., the following works were completed:

  • Overhaul of storage tank No. 5, V=5,000 m³, at Fuel Base No. 5 in Emilianów
  • Repair of the load-bearing columns of the pipe rack at Fuel Base No. 2 in Nowa Wieś Wielka
  • Construction of an additive dosing installation at Fuel Base No. 2 in Nowa Wieś Wielka

CLIMBEXFor CLIMBEX S.A., the following works were completed:

  • Overhaul and certification of tank 25, V=50,000 m³, at the Miszewko Strzałkowskie Base
  • Overhaul and certification of tank 26, V=50,000 m³, at the Miszewko Strzałkowskie Base
  • Overhaul and certification of tank 21, V=100,000 m³, at the Adamowo Base
  • Overhaul and certification of tank 22, V=100,000 m³, at the Adamowo Base

CKTiSFor CKTiS S.A., the following works were completed:

  • Installation of transfer pipes at PKN Orlen S.A.
  • Removal and installation of DN500 flanges on coolers at PKN Orlen S.A.

Year 2015

AGATFor AGAT S.A., the following works were completed:

  • Piping and foam system, as well as loading lines and arms, at Fuel Terminal No. 74 in Ostrów Wlkp.
  • Laying of a 530 pipeline under the Bogusławice marsh

PERNFor PERN S.A., the following works were completed:

  • Installation of a sanitary sewage tank at ST2 Zawady
  • Overhaul of the pipeline under a road in Skwierzyna
  • Modernisation of the Kc-1 II and Kc-2 II pig receiving and launching chambers at the Miszewko Strzałkowskie Base
  • Protection of the pipeline at a crossing with a drainage ditch in Leszno
  • Modernisation of the process piping and reconstruction of line I and II pipeline supports at SZ640 Bielinek
  • Repair of the rolling ladder on tank No. 13 at the Miszewko Strzałkowskie Base
  • Overhaul of the pipeline under a road in Ramutówko

CLIMBEXFor CLIMBEX S.A., the following works were completed:

  • Overhaul and certification of tank 2, V=50,000 m³, at the Gdańsk Base
  • Overhaul and certification of tank 29, V=50,000 m³, at the Miszewko Strzałkowskie Base

MOTA-ENGILFor MOTA ENGIL CE S.A., the following works were completed:

  • Protection of DN500 and DN800 pipelines under drainage ditches

Year 2014

PERNFor PERN S.A., the following works were completed:

  • Repair of the rolling ladder on tank No. 9 at the Miszewko Strzałkowskie Base
  • Overhaul of the DN500 pipeline under a road in Gutowo Wielkie
  • Overhaul of a bund at the Adamowo Base
  • Modernisation of tank-side pipelines on tanks 23 and 26 at the Miszewko Strzałkowskie Base
  • Overhaul of the DN300 pipeline on the SF1 Płock – Nowa Wieś Wielka section in Seroczki Kol.

OLPPFor OLPP Sp. z o.o., the following works were completed:

  • Replacement of process tanks at Fuel Base No. 17 in Barycz
  • Overhaul of process installations in the product pump station at Fuel Base No. 15 in Narewka

AGATFor AGAT S.A., the following works were completed:

  • Expansion of the fuel supply system in Gdynia
  • Anti-corrosion protection of tank-top manholes at MPS-2 in Krzesiny

CLIMBEXFor CLIMBEX S.A., the following works were completed:

  • Overhaul and certification of tank 2, V=50,000 m³, at the Gdańsk Base
  • Overhaul and certification of tank 29, V=50,000 m³, at the Miszewko Strzałkowskie Base

MOTA-ENGILFor MOTA ENGIL CE S.A., the following works were completed:

  • Protection of DN500 and DN800 pipelines under drainage ditches
  • Protection of pipelines under roads in Deszczno during construction of the S-3 expressway

Year 2013

AGATFor AGAT S.A., the following works were completed:

  • Construction of the MPS-1 and MPS-2 airfield fuel depots with a transmission pipeline at the Poznań-Krzesiny military airfield

PERNFor PERN Przyjaźń S.A., the following works were completed:

  • Repair of the embankment at BS Plebanka
  • Construction of fencing at Z6W Helenka and Z10W Leszno
  • Repair of foundations in the line II outlet bund in Zawady
  • Installation of a DN1200 gate valve at LOTOS Gdańsk
  • Modernisation of protection systems at the Miszewo Strzałkowskie Base
  • Installation of a DN1000 gate valve at BM Gdańsk

—For TECHNOMONTAŻ Sp. z o.o., the following works were completed:

  • Spark-free pipe cutting at the Emilianów Fuel Base

CKTiSFor CKTiS S.A., the following works were completed:

  • Anti-corrosion protection of steel structures in Kraków – Olszanica

Year 2012

AGATFor AGAT S.A., the following works were completed:

  • Modernisation of JET-A1 fuel loading and receipt at Fuel Terminal No. 81 in Kraków Olszanica
  • Construction of the MPS-1 and MPS-2 airfield fuel depots with a transmission pipeline at the Poznań-Krzesiny military airfield

PERNFor PERN Przyjaźń S.A., the following works were completed:

  • Overhaul of the oil bunker at ST-4 Kleczew
  • Repair of the protection of a pipeline crossing a watercourse in Gorczenica
  • Replacement of a DN600 gate valve at SZ Jasienica
  • Elimination of shallow cover of a fibre-optic cable at the crossing with the Brzozów canal

OLPPFor OLPP Sp. z o.o., the following works were completed:

  • Reconstruction of the separator at the road tanker loading front at Fuel Base No. 22 in Małaszewicze

ORLENFor PKN ORLEN S.A., the following works were completed:

  • Repair of a compensator with associated infrastructure on tank 2-22 at the Mościska Fuel Terminal

—For IDS-⁠BUD Sp. z o.o., the following works were completed:

  • Protection of the DN250 fuel pipeline during construction of the Auchan shopping centre in Łomianki

ORLENFor ORLEN Projekt S.A., the following works were completed:

  • Installation of a coke separator on the Olefins II unit at PKN Orlen S.A.

MERKOPFor MERKOP MMK sp. z o.o., the following works were completed:

  • Overhaul of tank No. 8 at Fuel Base No. 9 in Wola Rzędzińska
  • Overhaul of tank No. 10 at Fuel Base No. 9 in Wola Rzędzińska

CLIMBEXFor CLIMBEX S.A., the following works were completed:

  • Mechanical overhaul of tanks 14 and 18 at the Adamowo Base
  • Installation of nozzles on tanks 13 and 14 at BM Gdańsk

POLIMEXFor Polimex - Mostostal S.A., the following works were completed:

  • Tie-ins to process pipelines at Fuel Base No. 5 in Emilianów

MICRONETFor MICRONET Sp. z o.o., the following works were completed:

  • Overhaul and certification of tanks No. 13 and 14 at BM Gdańsk

Year 2011

AGATFor AGAT S.A., the following works were completed:

  • Lowering of a pipeline at BM 111 in Wrocław
  • Reconstruction of the pump station and residual tank installation at the Emilianów Fuel Base
  • Works during expansion of MPS-1 and MPS-2 at Łask Airfield
  • Construction of an SR station for fire protection with directional pipelines for tanks EB1 and EB2 at BM 111 in Wrocław
  • Construction of a DN200 pipeline connecting tanks at BM 111 in Wrocław
  • Connection of the fire-fighting foam monitor system at BM 111 in Wrocław
  • Fabrication of adapters for ENRAF devices at BM 111 in Wrocław
  • Installation of a fire sprinkler system at the road tanker loading front at BM 111 in Wrocław

PERNFor PERN Przyjaźń S.A., the following works were completed:

  • Replacement of test posts – Central Section
  • Overhaul of the R1 – R2 pipeline in Gdańsk
  • Overhaul of the crude oil catcher at ST-6 Łupowo
  • Overhaul of road crossings in Mykanów and Konopiska
  • Installation of test posts in Mirosław
  • Replacement of a pipeline in Trzepowo Nowe

OLPPFor OLPP Sp. z o.o., the following works were completed:

  • Works on tank No. 11 in Wola Rzędzińska
  • Welding of nozzles on tanks 1, 2 and 3 in Wola Rzędzińska
  • Welding of nozzles on tanks 7, 10, 11 and 12 in Wola Rzędzińska

ORLENFor ORLEN OIL, the following works were completed:

  • Replacement of pipelines on the Mek-Tol unit at PKN Orlen S.A. in Płock

—For SENSOR ACM, the following works were completed:

  • Modernisation of 23 tanks at OLPP bases

—For TM-⁠BUD S.C., the following works were completed:

  • Fabrication and installation of a structure for fire monitors at the military base in Cybowo

MERKOPFor MERKOP MMK sp. z o.o., the following works were completed:

  • Overhaul of 3 tanks at OLPP in Wola Rzędzińska

Year 2010

AGATFor AGAT S.A., the following works were completed:

  • Modernisation of the fire protection system at OLPP Fuel Base No. 9 in Wola Rzędzińska
  • Modernisation of 10 tanks at PKN Orlen SA
  • Modernisation of overpressure protection systems for crude oil pipelines at BS Plebanka

PERNFor PERN Przyjaźń S.A., the following works were completed:

  • Decommissioning of a pipeline section in Napachanie
  • Overhaul of a railway crossing in Mykanów
  • Sealing of the SZ7W Plecewice and SZ6W Helenka valve chambers
  • Repair of the pipeline under a road in Trzepowo Nowe
  • Repair of the hydrant network at ST-3 Góry
  • Elimination of shallow cover of the DN 500 crude oil pipeline in Polesie
  • Insulation works at pipeline entry and exit points at ST-6 Łupowo

MICRONETFor MICRONET, the following works were completed:

  • Overhaul of storage tank No. 9 at OLPP in Wola Rzędzińska

Year 2009

AGATFor AGAT S.A., the following works were completed:

  • Furfural unit at Orlen Oil in Płock
  • Expansion of Storage Base 111 in Wrocław

PERNFor PERN Przyjaźń S.A., the following works were completed:

  • Anti-corrosion protection of the pipeline in Sławoszewek
  • Installation of a DN 500 gate valve at ST-4 in Kleczew
  • Connection of leak tanks at ST-2a in Orzechowo
  • Elimination of shallow pipeline cover in Władysławów, Grabowa and Laski
  • Replacement of a pipeline section under a road on the Góry–Kleczew section
  • Anti-corrosion protection of the R1-R2 pipeline in Gdańsk

Year 2008

PERNFor PERN Przyjaźń S.A., the following works were completed:

  • Replacement of DN 600 gate valves at the Bug–Narew river crossing
  • Replacement of DN 500 pipeline in Morasko, Chwałkowo and Psary Polskie
  • Overhaul of the hazardous waste storage building at BS Miszewo Strzałkowskie
  • Overhaul of the fire-fighting network at ST-4 in Kleczew
  • Elimination of pipeline exposure and shallow fibre-optic cable cover in Jamki, Rękoraj Dobra, Biskupia Wola and Kamieńsk
  • Removal of cross-connection gate valves at the Rd0 manifold connecting the R1 and R2 pipelines at BM Gdańsk
  • Road crossings in Krubin, Osmólsk, Osmolin, Czerniew and Niespusza

AGATFor AGAT S.A., the following works were completed:

  • Fabrication and preparation of a DN 300 pipeline for HDD installation under the Vistula between the Winduga and Kawka valve stations
  • Fuel storage installation at Air Base No. 32 in Łask

Year 2007

ORLENModernisation of the installation at PKN ORLEN Storage Base No. 82 in Żurawica, comprising:

  • Installation of a new rail loading system for standard and broad gauge track
  • Installation of a new road tanker loading system
  • Removal and reinstallation of fire-protection piping for the loading systems and the toluene tank
  • Modernisation of the foam and water pump station
  • Construction of a toluene pump station and vapour recovery unit
  • Construction of a residual product system
  • Piping of the pipe racks

—Construction of a fuel storage installation and an MPS1–MPS2 transmission pipeline at Air Base No. 32 in Łask, comprising:

  • Installation in the aviation fuel filter chamber
  • Piping of the safety tank
  • Construction of underground inter-facility pipelines and a transmission pipeline

PERNModernisation of the process installation in the line I pump station of PERN S.A. at ST-⁠4 Kleczew:

  • Construction of a header for discharging crude oil from the discharge pumps

—Drainage of the fire-protection system on the V=2500 m³ storage tank

  • at PKN ORLEN S.A. Storage Base No. 31 in Gdańsk

Year 2006

PERNFor PERN „Przyjaźń” S.A., the following works were completed:

  • Inspection of pipeline road crossings in Podolin, Karpin, Majków and Twardosławice
  • Overhaul of the perimeter fire-fighting network at ST-1 Adamowo

NAFTOREMONTFor NAFTOREMONT Sp. z o.o., the following works were completed:

  • Inspection of the condition of 800 m of DN 800 pipeline at Lotos Gdańsk

—For Suchy Las Municipality, the following works were completed:

  • Construction of a casing pipe for the DN 700 and DN 1000 crude oil pipelines

—For HERO Polska Sp. z o.o., the following works were completed:

  • Installation of a jam production line
  • Installation of a juice line

Year 2005

PERNFor PERN „Przyjaźń” S.A., the following works were completed:

  • Inspection of pipeline road crossings in Koluszki
  • Overhaul of leak tanks in Łupowo, Kleczew and Tarnowo Podgórne
  • Inspection of pipeline road crossings in Łojki, Szarlejka, Lgota and Wola Hankowska
  • Overhaul of industrial sewerage in Kleczew
  • Modernisation of the line I pump station oil cooling system in Kleczew, Tarnowo Podgórne, Łupowo and Góry

NAFTOREMONTFor NAFTOREMONT Sp. z o.o., the following works were completed:

  • Decommissioning of a disused DN 600 pipeline in Sokołów Podlaski

Year 2004

PERNFor PERN „Przyjaźń” S.A., the following works were completed:

  • Inspection of pipeline road crossings in Łąck, Lubień Kujawski and Chotel
  • Replacement of the pipeline under a road in Sompolno
  • Elimination of shallow pipeline cover in Budy Kozickie

NAFTOREMONTFor NAFTOREMONT Sp. z o.o., the following works were completed:

  • Construction of a fuel station at BS Plebanka

Year 2003

PERNFor PERN „Przyjaźń” S.A., the following works were completed:

  • Inspection of pipeline road crossings in Sokołów Podlaski and Siemiatycze
  • Overhaul of the PG3 pump unit piping at ST 2A Orzechowo
  • Overhaul of pump venting piping at BS Plebanka
  • Overhaul of the pipeline over the Warta – Gopło canal